I have a to do line job its is 100m long what is the best to surry the line


Trey 09-07-2010
reply profile send pm notify

I normally do 5 Gallons of Bentonite to a 100 feet of line. So I'd mix up about 15-20 Gallons

PumpKid_88 09-07-2010
reply profile send pm notify

a yard of grout or water i prime 200 foot of line with just water

Pump N00b 09-07-2010
reply profile send pm notify

Dump a sack or two of cement in your hopper, add water and mix it in reverse 'till it looks like pancake batter.
Wet your hoses with water and of you go.
And it can go in the pour, not like bento or slick-pak, slick-pak can go in the pour, but noone likes it.

stonezer 09-07-2010
reply profile send pm notify

I just pumped downhill 760ft I used 2 hard nerf balls..first i put in 1 ball pushed it as far in the line as i could..mixed up a bag of slick-pak 2 (2- 5 gallon buckets) then put in the other ball attached the line to the pump then mixed up another bag of slick-pak also 2 buckets..and a yard of grout..no pressure at all ..well no spikes in pressure that is.. the balls help keep the slurry to coat the whole line ..not just the bottom..worked for me 12  times in a row no plug ups..good luck!! 

Dipstick 09-07-2010
reply profile send pm notify

Stonezer. That sounds good. Never heared that one before. So after the slick packs etc you just put the concrete? Any special like reduced rock on the first load?

Howmuch of the slick pack is left between the bals when it gets to the end?


jj707 09-07-2010
reply profile send pm notify

downhill 760 ft good job I have done jobs such as this and used water in front of prime instead of slikpak put a sponge in the 3rd pipe from pump (20 ft)put valve in the middle of cylinders and put 20-30 gallons of water and then the grout and I have never plugged using this method.

precision pumped 09-10-2010
reply profile send pm notify

hi pal i do 100 m line jobs use grout nice and creamy its the best :)