4 placing booms 2 electric trailer pumps. University Montreal Hospital.
DaveTPG 10-10-2014
comment profile send pm notify

Just thought I'd share some pictures and the final stats from the Centre Hospitalier de l'Université de Montréal - Bloc D job we are completing. It was a hell of a challenge, with many ups and downs, but in the end, we are very proud of what we've accomplished.

Job Stats
Length: Over 2 years
Amount of Concrete: 100,000 cubic meters
Building footprint: 100,000 sq ft
Height: 21 floors @ over 300' vertical. Non-Standard floor spacing.
Equipment: 4 x Putzmeister MXR 36/40Z placing booms, 2 x Putzmeister BSA 2107E electric trailer pumps, Over 2000' feet of line in esser ZX system over 5 lines for 5 placement points, and 4 diversion valves.

FYI, these booms and pumps are looking for some new action, so if anyone is interested in some long-term rental feel free to get in contact with us! www.pompagetpg.com .

 


shady rashed 10-11-2014
reply profile send pm notify

nice work.i know it is very diffcult .i tried this too many times.


foundationperson 10-11-2014
reply profile send pm notify

Nice Job TPG. Boy these guys go back a few years in pumping. Hope it all goes well for you guys.


Vitulla 10-18-2014
reply profile send pm notify

Nice pictures. Some good guys at TPG and a hell of a mechanic Patrick is keeping these machines running. Thanks for acaccommodating us this week.


mudgator 10-21-2014
reply profile send pm notify

Yup.  Good call Dan. David.... You guys are very professional! let's grab some dinner soon. I still need to check out a Habs game with you. Pat had his bearings that's for sure.