jonno | 06-07-2009 | comment profile send pm notify |
Got the job card says “32m boom for pile cap†think cool probably a bit of over kill sending the 40m but should been cruzey. When we get there find there is no foremen or engineer around yet, but quickly work out there is not much room to put a 32, and leave access for tippers to get to an excavator at the end of the track + threw traffic going under bridge? So we pull under the bridge and start to set up, engineer turns up, comes over and says “you you can open boom up under hear??!! (Indian accent) I say “yes we should get her up about mmmmm………………………….. 2mâ€, O how we get concrete over there. ïŠ Well here are the pics
Do want to say thanks to my line hand Sean for carrying my ass on this one, he did all the hook work while I just stood there and took photos and well turned the pump On and Off!!
|
||
Many | 06-07-2009 | reply profile send pm notify |
Nice pic's and job,only thing missing is a blast net.All jobs should be that easy. |
||
biged | 06-07-2009 | reply profile send pm notify |
That looks good what sizes are the reducers starting with largest to smallest and what gear are pumping in ?? |
||
Pump It155 | 06-07-2009 | reply profile send pm notify |
now thats the way to reduce down to . not off the 45 nice job and pics |
||
Telealbelt | 06-07-2009 | reply profile send pm notify |
A front discharge mixer and its 24' chute would be used here. Not an option there I suppose. LOL |
||
jonno | 06-08-2009 | reply profile send pm notify |
Thanks guys
Blast net would be good, I personally have not seen one in oz, so it would be pretty good to run safety feature most people are not aware off. Hey biged, reducers are High pressure 6†to low pressure 5â€, 5†to 4†and 4†to 3 ¼†then 10m (32feet) of Chinese steel belt 3 ¼†hose. Truck runs a electronic sequential shift 8speed box, each gear has a high and low, pump requires truck to be in 8low.
|
||
Pump N00b | 06-09-2009 | reply profile send pm notify |
Strange they can't do it the same way as on EU Mercedes', |