local18,  sweet pics and nice stick.  was that a slip form-continuous pour? if so how long did take to pump the silo?


local18 11-29-2008
reply profile send pm notify

It was a slip form, but not a continuous poor. We started out with a 39 and as we went up we brought in bigger pumps. We poured every three days,with the total height being 160 feet. The picture is the base for a million gallon water tank. They are getting ready to lift the tank. I will post pictures of it, this tank is huge.

18


Bob 11-29-2008
reply profile send pm notify

Looking at the repetitive pattern in the surface of the structure I would think it was a "jump form" job.

ShortStik 11-29-2008
reply profile send pm notify

when your stick is straight up in the open country side, does the wind push the boom around?