For the Record books. oh we dont have a record book do we.
Todd 08-20-2009
comment profile send pm notify

I would like to start a section of ConcretePumping.com that keeps track of our industry records. What do you guys think? If we are going to do this here is some of the things we need to think about.


  1. What are the records going to be, such as Largest Single Pour by company? By pump, by pump size and so on, Largest matt pour and so on.

  2. What info are we going to require to capture a record?



I think we need to give credit were credit is due right guys?


pudding 08-20-2009
reply profile send pm notify

what about over sleepin the longest. lol.  Or being lost forever..i mean the longest. trying to b funny is all no harm Ah?

mtnpumper 08-20-2009
reply profile send pm notify

How bout highest elevation, lowest elevation, coldest, hottest, most hours straight pumping, driving?

yard whore 08-20-2009
reply profile send pm notify

YA, OR WHOS GOT THE LONGEST STICK!


mtnpumper 08-20-2009
reply profile send pm notify

is that folded or unfolded?

Many 08-21-2009
reply profile send pm notify

Sure would be nice if anyone that worked on the Regan building in DC several years ago would post something.Think the pushes were up to 1250',42m placing boom,several 28m blockouts as well.The batch plant system was absolutly a marvel how it was done in the basement.

As I recall there was only 28 gal water per yard and the res chemicals/admixtures.


Chubby 08-21-2009
reply profile send pm notify

most yards an hour on a lp most hose on a lp

northwest63 08-22-2009
reply profile send pm notify

i wont to go on record to say we are going to brake a record trying to set one...LOL...