Loaded: Ready to Rock
ShortStik 02-05-2009
comment profile send pm notify

Didn't want to load another 100' of pipe, so i took hose.  another 125' of 3" hose on site.

should be interesting. Max400' off the boom.  Supliar say their going to give me a birds eye/high flow mix.  "we'll see" says the Zen master.

 


Mr wibau 02-05-2009
reply profile send pm notify

Come on mate you can fit more on there. Do you want me too show you how too do it. Hehe have fun mate.

DeReK 02-06-2009
reply profile send pm notify

lately that seems to be my average day, except with 4", i just cant figure out how to put pictures up.

DeReK 02-06-2009
reply profile send pm notify

now that i looked a lil closer, im thinkin that is 4"??

Drew AUS 02-06-2009
reply profile send pm notify

4 inch pipes and 3.5 inch hose looks like

ShortStik 02-06-2009
reply profile send pm notify

5" pipe, 3 1/2" hose

end up being boom, 110' 5", 100' 3 1/2", 125' 3".  other then the grout/primer i should have regected (3/4" crushed rock in it???) day went without a hitch.  got another 300' tomorrow.  YEE HAA 6 days this  :)

mr wibau, one morrowning i'll be leave half of what your carrying every day.  LOL.  How do you stop the pipe from pulling away from the 5" D/E hose?  I'm glad the custumer wanted qualtiy and not meter/hour records

And look who showed up for the fun


Mr wibau 02-07-2009
reply profile send pm notify

hey mate pipes pulling away? dont really have this problem. only sometimes they want too kick back too the pump. this only happens when i run three hoses 3 1/2.only do that if i really have to i just stay with 2 hoses.a big problem i can see tell me if i am wrong the bellend tail ends 4 to 3 1/2 inch creat back pressure. i use 3 1/2 inch tail ends and run a good readucer at the start.also tyres under the pipes creats good friction too stop kicking pipes.