Joel@4perllc.com | 12-01-2011 | comment profile send pm notify |
Cifa 31 5-section. This ought to be sweet in a tight spot! |
||
Joel@4perllc.com | 12-01-2011 | reply profile send pm notify |
Cifa 40Z 4 section |
||
Joel@4perllc.com | 12-01-2011 | reply profile send pm notify |
My baby out at the poo poo palace...just cant figure out why in the world a public pedestrian bridge is needed going through a shit plant! who wants to walk or bike through there?! |
||
Joel@4perllc.com | 12-01-2011 | reply profile send pm notify |
|
||
Joel@4perllc.com | 12-01-2011 | reply profile send pm notify |
was a bit tight finding room to set up as well |
||
Joel@4perllc.com | 12-01-2011 | reply profile send pm notify |
And just for grins...a video of the 46 Meter http://www.youtube.com/watch?v=CnNKbqytrgY |
||
biged | 12-01-2011 | reply profile send pm notify |
Looks good the only thing is the finishers need to get going they are way behind. |
||
concreteluvr | 12-01-2011 | reply profile send pm notify |
...just cant figure out why in the world a public pedestrian bridge is needed going through a shit plant! who wants to walk or bike through there?! TO GET TO THE OTHER SIDE! |
||
Todd | 12-01-2011 | reply profile send pm notify |
good one concreteluvr
|
||
seedless | 12-01-2011 | reply profile send pm notify |
Hahahah two mixers to the pump and two Placers???? what pebble finish. I like the concept LOL. |