OPERATOR EVALUATION CHECKLIST
Todd 05-08-2014
comment profile send pm notify

OPERATOR EVALUATION CHECKLIST

Coach must insure all items are explained, understood and accomplished

 

 

 

1. Arrive at yard – rested

      a. Pre-trip inspection  DOT

      b. Walk around – (YOUR COMPANY NAME HERE)

            1. Back end buttoned-up

            2. Outriggers locked

            3. Remote

            4. Sponge 

      c. System check

            1. Safety straps (ONE) for each hanging item

            2. Pipes, hoses, clamps and special items

      d. PPE

            1. Hard hat

            2. Safety glasses

            3. Fall protection

             4. Safety Vest

      e. Documentation

            1. Registration

            2. Over weight permit

            3. Insurance card

            4. Job ticket (explain terms and conditions on reverse side)

            5. Correct drivers license for equipment

      f. Clean windows & mirrors

      g. Wear seat belt

      h. Lights on for safety

 

2. Driving    

      a. Alert (no distractions) most accidents happen on road

      b. Follow the rules of the road

      c. Following distance – differs for road conditions and truck size

      d. Lane changes signal and plan well in advance

      e. Be aware of traffic conditions

 

3. Arrive at job site (check with superintendent or foreman FIRST)

      a. Ground conditions

            1. Soil

            2. Underground hazards

      b. Set-up

            1. 3 deg’ level

            2. Dunnage (sufficient to transfer download to soil within ACPA specs)

            3. Overhead obstructions – cranes (communicate!)

            4. Power lines – NEVER operate closer than 17 feet

            5. Mixer access

            6. Other craft traffic

            7. Reach

            8. Job site safety hazards

c. Prime out

            1. Warning to crew – Keep safe distance until prime complete

            a. Hose whip

            b. Hose kinking

            c. Concrete splatter

            d. Line pressure

            e. Proximity to boom & system

           

 

d. Prime agent   

1. Type

2. Amount

c. Sequence

4. Pumping

      a. Plan the pour  

            1. Communicate with hose man

      b. Anticipate the move (do not play catch up)

      c. Hose hugging

      d. RM truck safe backing

      e. Crew aware of hose movement

      f. Things we will not do (why)

            1. Boom closer than 17’ to high voltage line

            2. Boom over power line NEVER!!!

            3. Boom over occupied house * sign ticket

            4. Boom thru unsecured joist

            5. Boom over moving traffic   * sign ticket

 

5. Moving Location on Job-site

      a. All considerations of original set up

      b. Hose whip – Keep boom safe distance from crew

      c. Concrete batch time

            1. Temperature of concrete

            2. Admixtures

            3. Slump

            4. Ambient temperature

      d. Re-stow boom & outriggers

 

 

6. Cleaning boom

      a. Sponge – suction

            1. Retrieve speed

            2. Hopper blow back

      b. Water pressure

            1. Water in hopper

            2. Washout plug & water pump

     

c. Air pressure DANGER!!! REQUIRES TWO PROPERLY TRAINED PEOPLE

            1. Proper blow out cap

            2. Catch basket

            3. Danger

            4. Use as a method of last resort

7. Cleaning hopper and valve

      a. Grate – closed

      b. Eye protection

      c. Hands never in valve

      d. Water rationing

 

8. Moving off site

      a. Rear end buttoned up

      B. All gear retrieved

      c. Ticket signed

      d. Walk around

            1. Dunnage – pads secure

            2. System secure

            3. Outriggers all locked

            4. Remote in cab

            5. Call dispatch

 

9. Return to yard

      a. Complete all required DOT post trip

      b. Turn in all tickets & log

      c. Notify shop of problems

      d. Check clipboard

      e. Clear out with dispatch

 

10. Drive home safely -