rapid set
number1pumper 06-21-2008
comment profile send pm notify

just got back from working near the mexico boarder pumping rapid set every night on the free way for 5 days and let me tell this stuff would dry in 3 min it was crazy but i got her done. and i used a 2006 reed b50 and it was pumping 2 inch rock and i had 150ft of 4 inch out

bri 06-22-2008
reply profile send pm notify

i was pumping a mix yesterday that cures to it potrtial in 36 hrs. when you are done pumping you better washout right where you are. If you fold up and move to wash you just got screwed. no lie bout this one.

Bob 06-22-2008
reply profile send pm notify

I knew an operator that pumped 1 1/2 through 2" line. 5 Miles of system and a 12 bag mix. His picture and his oiler below.

 

 

;~)


johnny 06-22-2008
reply profile send pm notify

2 inch rock thru 4 inch line? with a reed!? are you sure about that

bri 06-22-2008
reply profile send pm notify

I run a 95 meter pump with 12" pipes. It will pump 700yrds an hr.The boom is a 10 section z-roll-telescopic-wrap around configuration. The truck has 30 axels. It is powered by a 3000hp jet engine. It has three s-tubes. The hopper holds 5 yrds.