OE Local 3 | 05-26-2008 | comment profile send pm notify |
A couple of the members here at Concretepumping.com had e-mailed me. They asked if I had any documented info on paper that could help them say NO when they got asked to do somthing unsafe. Hope this helps gentleman. Just print it and keep it in your cab. One is about using S-bends or what some of you call double 90's. The other is on extending the net Reach. be safe out there ! 3
|
||
OE Local 3 | 05-26-2008 | reply profile send pm notify |
Also wanted to Say : "Thank You" to all active,inactive,and retired Military. Thinking of all of you, on this Memorial Day !
3 and Family |
||
Bob | 05-27-2008 | reply profile send pm notify |
Cultures, regulations, habits, and plane old standard operating procedures are different wherever you go. So what is right? Right, as it turns out is relative. If you look at this problem with the same mental dexterity as 'time' it makes sense. Look at the time log when you make a post. It is relative to where you are in the world whether or not the time [on the message board] is in sync with the time on your watch or clock where you live. All things are relative to your place and situation. All regulations need a home base as well. The home base for the rules and regulations on ConcretePumping.com are based in the We all have the same experiences pumping concrete. I have pumped all over the world. The concrete is concrete, the ground pressure is ground pressure, and the reach of the boom is the reach of the boom. A plug is a plug, etc. Since the site is in the Our ( So when you want to talk about a practice that is outside the operational norm of |
||
bri | 05-28-2008 | reply profile send pm notify |
I remeber working for a company and was told I have to put a 30' trimmee pipe on. I told them it looked as if the tip was goning to snap they said it will be fine. I am sure that tip section will never be the same. |