system
kneerick 09-23-2008
comment profile send pm notify

whats your record how much have you done

Many 09-23-2008
reply profile send pm notify

about 1500 both uphill and downhill.

Vail,Keystone,Breckinridge


kneerick 09-23-2008
reply profile send pm notify

how about 800' off the assend of a 32mor750'off the end of the boom and move 5 times a day

roadhog 09-23-2008
reply profile send pm notify

how about 8feet of the end of the boom and one job a day,nice and easy.

ChumpswithPumps 09-23-2008
reply profile send pm notify

How about 3700 feet off the back end of a 800/28.  That wasn't so bad but we had to use everything we had-5" metric/ 4"hd/ 4" vic and that wasn't even the bad part-It was inside a "tube" that was only bearly 4.5 feet tall.  And we did that every other day for 2 months.  And yes that was almost 30 yrs ago when I REALLY didn't know any better! I'm still having trouble standing up straight!

pudg 09-23-2008
reply profile send pm notify

1900 ft with a whiteman in the south louisiana marsh back in 1993 for 4 days straight,and it wasnt bad at all

typesdubs 09-23-2008
reply profile send pm notify

1000' with a P-88, using 1.25" plastic well drillers tube pumping grout to fill an old well. Would use a bigger pump next time.

typesdubs 09-23-2008
reply profile send pm notify

Or how about 1 yard, 25' into a bank with a trailer pump. That's a record I wish I could do everyday.


Mudslinger 09-23-2008
reply profile send pm notify

1500' 5" piggyback ,with a Thompsen 890 skid fed by the FIRST Challenge univalve! 400 yd pour and at the 200 mark the Thompsen blew a ram seal! She was done! So we drug it out of the way,welded a connection in,all in 45 minutes and went back to work! The 2 pumps could average 37 yds an hour but the univalve got 55 per by itself! Tried to overheat but we trashpumped cold riverwater over the hydraulic tank! Now all you old Titan operaters know who to blame!! LOL

toper 09-23-2008
reply profile send pm notify

i got one, 12.5'. over a 6' sidewalk and down 4'. with a trailer pump,footing too low to tailgate hahaha

hammah 09-24-2008
reply profile send pm notify

1000' underground parking structure all 4" off of a 39 M to pour walls and all the line was dumped.