Safety first on that jobsite. Edmonton Dec. 2005. 32m Putz expanded all out with 3x 3.5" hoses on (Not that much). Nice crew, nice job. Problem was Citycenter 100 and 103, Jasper Ave. Downtown next to the Gov. Building. Told the Mixerdriver not to leave until i tell him. He left (Fu**** A**). Had to go all the way around, up (5storeys) and inside the hallway to go to jobsite. Took some minutes. Left the job as clean as a babydiaper (Before shit happens) dont leave a mess infront of a Gov. building!. And after that had to drive 30min. finding a washing spot to clean. Now thats what others say, if you are lazy or slow you should not do that job because it can be a pain in the ass and come back to you real quick.

chico777 03-30-2009
reply profile send pm notify

All insulated pipes that brings over some 10min. in wintertime to wash and clean otherwise its frozen what is better than stiff.