SUPERDOFFER | 09-04-2008 | comment profile send pm notify |
18 storeys high Rocca-al-mare project in Tallin Estonia 100 KG per M3 steel fiber they say it was not posible whit a pump??? |
||
SUPERDOFFER | 09-04-2008 | reply profile send pm notify |
Sergei can you tell us more about this project |
||
Mr wibau | 09-05-2008 | reply profile send pm notify |
hey mate sounds like a cool job. would love too know what size fiber it was, i pumped a job once it had ten pipes one ten meter four inch hose off boom on four inch wibau. it was 2 inch long fibers with only 20kgs to the m3 that was hard enough. |
||
Black0ut | 09-05-2008 | reply profile send pm notify |
i have tried 60 kg per m3, no problem for the pump.. working with the concrete is a pain in the ass... |
||
SUPERDOFFER | 09-05-2008 | reply profile send pm notify |
It was not our job.I have read about it |
||
SUPERDOFFER | 09-05-2008 | reply profile send pm notify |
the concreet was euro norm c30/37 F6 XC1 (0/16) whit 100 kg/m3 1.3/50mm steel fiber for a job of 11000 m3 i think whe had give it a try they done it whit a crane |
||
Sergei | 09-05-2008 | reply profile send pm notify |
I have not found any information on this project. |