Login Register

Login Form


Concrete Pumping

  • Message Board
  • Social
  • My Profile
  • Mail
  • Browse
  • Search
  • Invite
  • Used Concrete Pumps
  • MarketPlace
  • Events Calendar
  • Map
  • Register
  • Login

Saturday, March 25, 2023 [7075 Members]

ConcretePumping.com

  • Used Concrete Pumps
  • Boom Pumps
  • Line Pumps
  • Placing Booms
  • Alliance Parts Department
  • Schwing Used Concrete Pumps
Home » Dictionary » Manufacturer's Job Site Stories » Carillion - Pedestrian Subway at Ackers Crossing - Congleton November 2002

Carillion - Pedestrian Subway at Ackers Crossing - Congleton November 2002

he project was to position a reinforced concrete box pedestrian subway under a railway line, thus removing the need for pedestrians to walk over the track via a surface crossing. The placement involved a 54 hour possession where approximately 30 metres of track was removed allowing the subway to be positioned via a jack and slide system.

Once in position the sides were backfilled and the track was reinstated; this is where the Telebelt came into its own. Using the larger material hopper attachment available an excavator loaded stone directly into it. The Telebelt then placed the stone directly to the point where it was required, evenly and swiftly. At set intervals the stone was then compacted as required.

Site comments were...

The level of control achieved with the remote unit was impressive. There was very little additional leveling out of material and the versatility of the machine meant that the backfilling operation was continuous, switching from side to side in an instant. The reduction in plant effectively eliminated damage to the benching detail and the geotextile layer and, most importantly, ensured that the area was kept clear of plant and debris, removing all the normal risks associated with such a task. All of the above contributed to a safer operation and a substantial gain in a very tight program.

Construction Manager - Chris Jackson. Senior Engineer - Martin Dobby. General Foreman - John Cassidy

Contact: Pochin Plant Ltd Brooks Lane Middlewich Cheshire CW10 0JQ

Telephone +44 (0) 1606 833333 +44 (0) 1606 833333 Fax +44 (0) 1606 836027 E-mail: sales@telebelt.co.uk www.telebelt.co.uk

Project Manager - Paul Blanchard E-mail: pblanchard@telebelt.co.uk

Image:cps2.jpgImage:cps3.jpg

  • Used Concrete Pumps
Alliant Insurance
Putzmeister
Used Concrete Pumps
Alliance Ad Used Concrete Pumps
USED CONCRETE PUMPS
Schwing Used Concrete Pumps

Alliance Used Concrete Pumps

Texas Fleet Inspections

We Buy Pumps

Wiki
  • History of Concrete Pumping
  • Concrete Pumping & Safety Articles
  • ConcretePumping.com Lifetime Achievement Awards
Dictionary
  • Dictionary
Helpful Resources
  • Concrete Pumping News
Site advisers
  • Advisors
Manufacturers
Putzmeister
Alliance Concrete Pumps
Dy Concrete Pumps
Betonstar
Schwing Concrete Pump
Sany Concrete Pumps
CIFA Concrete Pumps
CPE America
Hyundai Everdigm
Transcrete
Olinpump
AUTOCAR
K&S Insurance for concrete pumping companies
Concrete Pump Remotes
Valme North America, Inc.
Pumper Caddy For Pumping Concrete
Dealers
Reinert Concrete Pumps
Mayco Concrete Pumps
Olin Concrete Pumps
Parts
Alliance Concrete Pump Parts
Putzmeister Parts
ESSER
SchwingParts.com
Lifton's Inc Outrigger pads
DICA
SS & L
FRITZ-PAK
Python Concrete Pipe Wrap
Valme North America, Inc.
Pumper Caddy For Pumping Concrete
Concrete Pump Sales
Software
Rapid ERP
  • About us
  • Advertise
  • Contact
  • FAQ
  • Privacy Policy
  • Terms and Conditions

© 2023 ConcretePumping.com. All rights reserved.