Concrete Pump Operator Training Checklist
Trainer: _________________________ Trainee: _________________________
Date Started: _______________ Completion Date: _______________
Pre-Training Qualification Verification
- [ ] Valid driver's license checked
- [ ] Previous experience documented
- [ ] Medical clearance verified (if required)
- [ ] PPE provided and proper use demonstrated
Safety Fundamentals
- [ ] Reviewed safety as the primary job responsibility
- [ ] Explained importance of being on time and prepared
- [ ] Demonstrated proper PPE usage (hard hat, safety glasses, gloves, boots)
- [ ] Reviewed company safety policies and emergency procedures
- [ ] Explained exclusion zone requirements and enforcement
Equipment Familiarization
- [ ] Identified specific pump model and key components
- [ ] Reviewed operator's manual with trainee
- [ ] Explained pump's functions, limitations, and specifications
- [ ] Demonstrated all controls and their functions
- [ ] Explained hydraulic systems and pressure indicators
Pre-Operation Procedures
- [ ] Demonstrated completion of daily inspection checklist
- [ ] Showed proper logbook documentation
- [ ] Practiced pre-trip vehicle inspection procedure
- [ ] Reviewed safe driving practices with outriggers stowed
- [ ] Explained importance of securing all components before transit
Site Assessment & Setup
- [ ] Demonstrated proper site assessment:
- [ ] Overhead power lines identification
- [ ] Ground conditions evaluation
- [ ] Underground utility awareness
- [ ] Traffic management considerations
- [ ] Accessibility for concrete trucks
- [ ] Practiced outrigger deployment procedure
- [ ] Demonstrated proper cribbing techniques for different ground conditions:
- [ ] Hard surface setup
- [ ] Soft ground setup
- [ ] Near trenches or excavations
- [ ] Practiced leveling the pump
- [ ] Verified proper load distribution on outriggers
Boom Operation
- [ ] Demonstrated boom unfolding sequence
- [ ] Practiced boom control and positioning
- [ ] Explained boom clearance requirements